
·9 min read
Solar Site Survey Checklist: Roof, Attic, Service Panel and Meter, Walked in Order
A solar site survey checklist in the order a surveyor actually walks a home: the street view and shading, each roof plane, the attic, the main service panel and the meter. What each stop decides about the design, and the five things missed on surveys that turn into change orders, redesigns and a second truck roll.